Douglas Road Main Replacement

douglas_road

Partner: Metro Vancouver

Contract Value: $7,000,000

Completed in 2010, this multi-phase water main replacement project included the installation of 2,825 lm of 200mm diametre ductile iron water main and 3,110 lm of 1524mm diametre steel pipe, a cast-in-place concrete cross-over chamber, a concrete cast-in-place line valve chamber, flow metres and all associated connections.